Contact Us
If you can't see what you like then please contact us and we'll call you back!

First Name:

Email Address:

Phone Number:

Enquiry: Code from image:


Bespoke Log Cabins For Sale UK

Log Cabin Installation Service

Top Ten Logcabin Tips

How To Build A Log Cabin

Quick Search

Quality Doors And Windows  

Log Cabin Image Gallery

Free UK Delivery Service

Building A Log Cabin - Top Tips

Log Cabin Erecting 

 
UKLogcabinsforsale Guide ... As soon as you are pleased that you have actually built a strong base for your yard structure that offers a company and level base throughout it is time to start the assembly procedure.
 
All our Log cabins have detailed self-assembly directions and guides to streamline the procedure:.
 
Please see below a basic guide to the assembly
 
The following devices are advised for the instalment of your Log Cabin: -.
Electric screwdriver, wooden or rubber mallet, level, hammer, saw, stepladder and string line.
 
1, First, lay the flooring into position beginning with piece A. Then Lay piece B beside piece A and put the 2 together. Then lay piece C beside piece B and put the 2 together (as flooring diagram).
 
2, Please bear in mind to not put the flooring too near walls and fences to permit the roofing system overhang at the sides, back and front. Consult your diagram for the specific overhang of your certain structure.
 
3, The very best means to get ready for constructing your log cabin is to put the specific wall parts beside the flooring in the appropriate element order (see each wall elements diagram).
 
4, When you are delighted with the design of your structure then it is time to begin structure.
 
5, The first logs to put down are the 2 half logs which are put onto the outside framework of the flooring not on top of the floorboards, then interlace a complete log along the back gable and the logs to the front gable making sure a tight fit.
 
6, This is a happy times for you to examine the structure is square, you could do this by determining from the front right hand edge to the exact same point in the back left hand edge then contrast this to the contrary front left and the right back edges, if these dimensions coincide then the structure is square. You could then continue structure, you will discover yourself developing side to side then front and back and so on.
 
7, When you have actually developed a layer of 5 logs it is time to fit the door into location, the greater you develop the logs the harder it comes to be to put the door in spot.
 
8, If you have actually bought a cabin with double doors then you will need to develop the door frame utilizing the 4 parts offered. The simplest method to do this is to lay the 2 door areas side by side face down, slot the sill into spot then the head, screw the 4 areas together with the joints with the 60mm screws offered.
 
9, Take the door / doors in addition to the frame and merely slide the frame over the logs till it if totally placed, repair the door deal with to allow you to open the door.
 
10, When you have actually reached the window height then follow the exact same treatment similar to the door, construct a layer of logs either side of where the window is to be fitted then slide the window into position.
 
11, Please Keep in mind: - If your base is not firm and level then this could trigger the doors and windows to turn or to go out of square (gravity pulling the doors level).
 
12, Some windows and door fascias could have to be cut to fit.
 
13, When the Windows and doors are in position then remain to develop your cabin approximately the gable height. The gables on many of our designs come repaired as one piece, this piece is then put on top of the last side boards, one at the front and one at the back. If the gable sits proud of the sides or the sides sit proud of the gable then the logs that are on the greater side should be knocked down further in to put.
 
14, The roofing system purlings are provided with notches either end and 23mm 45 ° cuts on both ends.
 
15, The roofing system purling notches then sit in the gable eliminates with the 23mm 45 ° cuts dealing with downwards.
 
16, Please see to it the purling is installed the proper means round and the proper over hang goes to the front of your cabin.
 
17, Take care of the purling to the gable utilizing 2 1/2 nails, attaching downwards with the gable into the purling.
 
18, First you have to see to it that the Cabin is totally upright on all sides, as when the roofing boards are attached into position the cabin is then a more stiff framework and could not be relocated as quickly. If this is refrained then this could possibly impact the doors and windows to be from square and not run properly.
 
19, Lay the roofing system boards on the roofing with the groove completed side dealt with down.
 
20, Begin at the front and work to the back dealing with each board as you pass attaching downwards into the purling and logs below, ensuring the boards run inline and parallel with the side of the structure. Please keep in mind the last board will need to be cut to the appropriate width so that it does not protrude past the end of the purling.
 
21, As soon as the roofing system boards are all in location and safely attached down, then the roofing baton is repaired in location by attaching it down underside of the roofing boards. The bottom edge is then completed of with a fascia which is attached onto the roofing baton.
 
22, The felt is protected by the roof felt attaches offered. If shingles are to be fitted then the felt must not be utilized. For shingle fitting see shingle packs for directions.
 
23, When the felt / shingles are fitted then the fascias could be fitted by attaching them to the leading purling and bottom Roofing Baton, complete off the fascias by attaching the peak over the top of the fascias where they satisfy between.
 
24, Utilize the 80mm Screws offered, screw the bottom layer of logs from the outside into the 19mm floorboard on the inside of the cabin. As soon as this has actually been done you could deal with the interior skirting boards which might need cutting to length and jointing in the edges.
 
25, The storm brace is made use of to hold / tie the cabin together however still let the cabin step throughout various weather. The storm brace have an opening at the top and a long groove at the bottom.
 
26, Repair the storm brace to the front and back gables with the 40mm coach bolts offered (see gable diagrams). If the storm brace is fitted too tight then the cabin will not have the ability to relocate, so constantly leave the bottom 40mm coach bolt slack enough to let the coach bolt go up and down inside the groove of the storm brace.